Restructure docs: archive VLAN migration, update IPs to VLAN 10
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
Major documentation cleanup after VLAN migration completion: - Archive 12 VLAN project docs to archive/vlan-migration/ - Archive 5 done WIP docs (VLAN proposals, AI stack, Fossorial, DNS backup) - Create standing reference docs 08-DNS-ARCHITECTURE and 09-TAILSCALE-VPN - Renumber docs to clean 01-09 sequence with merged CHANGELOG - Update all active docs from stale 192.168.31.x to current VLAN 10 IPs - Fix CSS1 (.10.9→.10.3) and ZX1 (.10.7→.10.4) IPs in hardware inventory - Clean 06-VLAN-DEVICE-ASSIGNMENT: remove migration columns/sections, fix VLAN 25 subnet Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -36,12 +36,12 @@
|
||||
|----------|-------|
|
||||
| **Role** | Distribution Switch |
|
||||
| **Location** | 19" Rack U1 |
|
||||
| **IP** | 192.168.10.9 |
|
||||
| **IP** | 192.168.10.3 |
|
||||
| **MAC** | F4:1E:57:C9:BD:09 |
|
||||
| **OS** | SwOS 2.16 |
|
||||
| **Serial** | - |
|
||||
| **Docs** | https://help.mikrotik.com/docs/spaces/UM/pages/17498168/CSS326-24G-2S+RM |
|
||||
| **Web UI** | http://192.168.10.9 |
|
||||
| **Web UI** | http://192.168.10.3 |
|
||||
|
||||
**Ports:** 24x 1G RJ45, 2x 10G SFP+
|
||||
- SFP1: 10G DAC to ZX1
|
||||
@@ -55,7 +55,7 @@
|
||||
|----------|-------|
|
||||
| **Role** | Core Switch (2.5GbE) |
|
||||
| **Location** | 10" Rack U7 (on shelf) |
|
||||
| **IP** | 192.168.10.7 |
|
||||
| **IP** | 192.168.10.4 |
|
||||
| **MAC** | 1C:2A:A3:1E:78:67 |
|
||||
| **Serial** | - |
|
||||
|
||||
|
||||
Reference in New Issue
Block a user