All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
Major documentation cleanup after VLAN migration completion: - Archive 12 VLAN project docs to archive/vlan-migration/ - Archive 5 done WIP docs (VLAN proposals, AI stack, Fossorial, DNS backup) - Create standing reference docs 08-DNS-ARCHITECTURE and 09-TAILSCALE-VPN - Renumber docs to clean 01-09 sequence with merged CHANGELOG - Update all active docs from stale 192.168.31.x to current VLAN 10 IPs - Fix CSS1 (.10.9→.10.3) and ZX1 (.10.7→.10.4) IPs in hardware inventory - Clean 06-VLAN-DEVICE-ASSIGNMENT: remove migration columns/sections, fix VLAN 25 subnet Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Archived Documentation
OBSOLETE - DO NOT UPDATE
These documents are from completed projects and legacy documentation. They are kept for historical reference only.
For current documentation, see the parent docs/ folder:
01-NETWORK-MAP.md- Network topology, IPs, services02-SERVICES-CRITICAL.md- Essential services03-SERVICES-OTHER.md- Non-critical services04-HARDWARE-INVENTORY.md- Hardware details05-PORT-UTILIZATION.md- Device port assignments06-VLAN-DEVICE-ASSIGNMENT.md- VLAN device mapping07-WIFI-CAPSMAN-CONFIG.md- WiFi and CAPsMAN settings08-DNS-ARCHITECTURE.md- DNS failover architecture09-TAILSCALE-VPN.md- Tailscale VPN setupCHANGELOG.md- Change history
Subfolders
vlan-migration/
12 documents from the VLAN migration project (completed 2026-01-31):
- Migration plans (v1, v2, v3)
- Implementation status trackers
- Setup progress logs
- DNS/AdGuard/Tailscale project docs (superseded by standing docs 08- and 09-)
- Device migration worksheet
Legacy Docs (root archive/)
- Pre-2026-01-25 documentation structure
- Completed WIP items (VLAN proposals, AI stack, Fossorial tunnels)
- Historical changelogs
Do not reference these archived documents for current state.