All checks were successful
ci/woodpecker/push/woodpecker Pipeline was successful
- Created 10-VLAN-NETWORK-SEGMENTATION.md with full VLAN plan - Added CSS326-24G-2S+ SwOS switch to 00-CURRENT-STATE.md - Documented switch credentials and web UI access - Proposed 4 VLANs: Secure (10), IoT (20), Kids (30), Guest (40) - Included cross-VLAN solution for S25 accessing IoT devices - Added SwOS configuration steps for port VLAN assignments Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>